CKC21C123GEGAC7210

Image is for reference,
please contact us to get the real picture

Part No :

CKC21C123GEGAC7210

Manufacturer
KEMET
Description
KC-LINK 2220 12NF 1200VDC C0G
Catalog
Ceramic Capacitors
Shipped from
HK warehouse
Expected Shipping Date
Aug 13 - Aug 17 2025
DataSheet
CKC21C123GEGAC7210 PDF
Availability
0 pieces
Unit Price
$2.33937

Current price of CKC21C123GEGAC7210 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Tape & Reel (TR)
Part Status:Active
Capacitance:-
Tolerance:-
Voltage - Rated:-
Temperature Coefficient:-
Operating Temperature:-
Features:-
Ratings:-
Applications:-
Failure Rate:-
Mounting Type:-
Package / Case:-
Size / Dimension:-
Height - Seated (Max):-
Thickness (Max):-
Lead Spacing:-
Lead Style:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 0603Y0500123JER

0603Y0500123JER

CAP CER 0.012UF 50V X7R 0603
HOT 18081A102JAT2A

18081A102JAT2A

CAP CER 1000PF 100V NP0 1808
HOT 1206Y0630123GCR

1206Y0630123GCR

CAP CER 0.012UF 63V C0G/NP0 1206
CP0007510R0JB14

CP0007510R0JB14

RES 510 OHM 7W 5% AXIAL

PF2472-0R13F1

PF2472-0R13F1

RES 0.13 OHM 100W 1% TO247

0603Y0630271KFR

0603Y0630271KFR

CAP CER 270PF 63V C0G/NP0 0603

CKC21C123GEGAC7210

CKC21C123GEGAC7210

KC-LINK 2220 12NF 1200VDC C0G

Top