SCAP,PBL-25/16.2

Image is for reference,
please contact us to get the real picture

Part No :

SCAP,PBL-25/16.2

Manufacturer
Tecate Group
Description
CAP 25F 16.2V CHASSIS MNT
Catalog
Electric Double Layer Capacitors (EDLC), Supercapacitors
Shipped from
HK warehouse
Expected Shipping Date
May 18 - May 22 2024
DataSheet
SCAP,PBL-25/16.2 PDF
Availability
27 pieces
Unit Price
$130.50000

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of SCAP,PBL-25/16.2 is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:PBL
Package:Bulk
Part Status:Active
Capacitance:25 F
Tolerance:-
Voltage - Rated:16.2 V
ESR (Equivalent Series Resistance):50mOhm
Lifetime @ Temp.:-
Termination:Screw Terminals
Mounting Type:Chassis Mount
Package / Case:Module, Wire Leads
Lead Spacing:-
Size / Dimension:3.740" L x 2.047" W (95.00mm x 52.00mm)
Height - Seated (Max):2.244" (57.00mm)
Operating Temperature:-40°C ~ 65°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT JJC0E477MSEC

JJC0E477MSEC

CAP 470F 20% 2.5V CHASSIS MOUNT
HOT TPLH-2R7/12WR10X30

TPLH-2R7/12WR10X30

CAP 12F 2.7V THROUGH HOLE
HOT TPL-100/18X60F

TPL-100/18X60F

CAP 100F -10% +20% 2.7V T/H
SCAP,PBL-25/16.2

SCAP,PBL-25/16.2

CAP 25F 16.2V CHASSIS MNT

2-3MBCRED144

2-3MBCRED144

#2BTRYCBL: RED 144"L, 3/8" LUGS

5-SA-R

5-SA-R

TWEEZERS - STRAIGHT TAPERED ULTR

6002ZZ

6002ZZ

BALL BEARING SHIELDED 15X32X9MM

Top