9620025

Image is for reference,
please contact us to get the real picture

Part No :

9620025

Manufacturer
JULABO
Description
F250 CHILLER, 250W, 115V
Catalog
Thermal - Liquid Cooling, Heating
Shipped from
HK warehouse
Expected Shipping Date
Jul 26 - Jul 30 2025
DataSheet
9620025 PDF
Availability
10 pieces
Unit Price
$3705.00000

Current price of 9620025 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:F
Package:Bulk
Part Status:Active
Product Type:Active, Recirculating Chiller
Power - Cooling:250 W
Current:5 A
Voltage:115VAC
Flow Rate:3.96GPM (15.0LPM)
Power Input:-
Thermal Resistance @ GPM:-
Fluid Capacity:-
Operating Temperature:-10°C ~ 40°C
Connection Type:-
Weight:60 lbs (27.2 kg)
Dimensions - Overall:16.00" L x 9.50" W x 21.00" H (406.4mm x 241.3mm x 533.4mm)
Ratings:-
Features:Temperature Control
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 9630100

9630100

AWC100 AIR TO WATER COOLER
HOT 180-12-12C

180-12-12C

COLD PLATE HEAT SINK 0.018C/W
HOT ATS-HE23-C6-R0

ATS-HE23-C6-R0

HEAT EXCHANGER WITH ONE 48V DC F
CX10S-HGD0GH-P-A-DK00000

CX10S-HGD0GH-P-A-DK00000

COOLX POWER SUPPLY

9620025

9620025

F250 CHILLER, 250W, 115V

VI-QCW31-ESY

VI-QCW31-ESY

VI-QCW31-ESY 24V/24V 12V 300W

TAT-125-1/2-2-STK

TAT-125-1/2-2-STK

HEATSHRINK 6.4-12.7MM RED 1.2M

Top