PMDU

Image is for reference,
please contact us to get the real picture

Part No :

PMDU

Manufacturer
Macromatic Industrial Controls
Description
THREE-PHASE MONITORING RELAY
Catalog
Protection Relays & Systems
Shipped from
HK warehouse
Expected Shipping Date
May 20 - May 24 2024
DataSheet
PMDU PDF
Availability
5 pieces
Unit Price
$149.38000

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of PMDU is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:PMD
Package:Box
Part Status:Active
Function:Phase Imbalance, Phase Loss, Phase Sequence, Overvoltage, Undervoltage
Voltage - Supply:190 ~ 500VAC
Trip Range:-
Delay Time:-
Mounting Type:DIN Rail
Termination Style:Screw Terminal
Features:Manual Reset
Operating Temperature:-28°C ~ 65°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT SE-703-0U-00

SE-703-0U-00

MONITOR EARTH LEAKAGE
HOT SE-325ST

SE-325ST

NGR MON EXTENDED RF TIME GF 0.1-
HOT SE-330HV-26-01

SE-330HV-26-01

MONITOR NGR HV 48V DUAL RJ45
AT401A

AT401A

TOGGLE HALF BOOT BLACK

TL1011

TL1011

END MILL CARBIDE 0.031"

PMDU

PMDU

THREE-PHASE MONITORING RELAY

AMI-M12Z-1-20-B

AMI-M12Z-1-20-B

LINE FILTER 250VAC 20A CHASS MNT

Top