DJT090A0X43-SRPZ

Image is for reference,
please contact us to get the real picture

Part No :

DJT090A0X43-SRPZ

Manufacturer
GE Critical Power (ABB Embedded Power)
Description
90A DC/DC CONVERT 0.5-2.1V
Catalog
DC DC Converters
Shipped from
HK warehouse
Expected Shipping Date
Aug 01 - Aug 05 2025
DataSheet
DJT090A0X43-SRPZ PDF
Availability
90 pieces
Unit Price
$46.35000

Current price of DJT090A0X43-SRPZ is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:DLynx II™
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Active
Type:Non-Isolated PoL Module, Digital
Number of Outputs:1
Voltage - Input (Min):7V
Voltage - Input (Max):14.4V
Voltage - Output 1:0.5 ~ 2V
Voltage - Output 2:-
Voltage - Output 3:-
Voltage - Output 4:-
Current - Output (Max):90A
Power (Watts):-
Voltage - Isolation:-
Applications:ITE (Commercial)
Features:Adjustable Output, PMBus™, Remote On/Off, Remote Sense
Operating Temperature:-40°C ~ 85°C
Efficiency:91.1%
Mounting Type:Surface Mount
Package / Case:Module
Size / Dimension:0.92" L x 0.56" W x 0.57" H (23.2mm x 14.1mm x 14.4mm)
Supplier Device Package:Module
Control Features:-
Approval Agency:TUV, UL
Standard Number:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT XCL221B361ER-G

XCL221B361ER-G

0.5A INDUCTOR BUILT-IN STEP-DOWN
HOT VE-2T0-EX

VE-2T0-EX

DC DC CONVERTER 5V 75W
HOT VE-920325B

VE-920325B

T 200/455/300 15V/ 33.3A
AQW280EHA

AQW280EHA

SSR RELAY SPST-NO 120MA 0-350V

HT801/DF51K-22S(A)

HT801/DF51K-22S(A)

TOOL HAND CRIMP DF51K 22AWG

140152

140152

CONN 2POS SCREW WHT 162 SERIES

DJT090A0X43-SRPZ

DJT090A0X43-SRPZ

90A DC/DC CONVERT 0.5-2.1V

Top