BAM017Z

Image is for reference,
please contact us to get the real picture

Part No :

BAM017Z

Manufacturer
Balluff
Description
SHORT DESCRIPTION=SILICON TUBE,
Catalog
Protective Hoses, Solid Tubing, Sleeving
Shipped from
HK warehouse
Expected Shipping Date
Jul 28 - Aug 01 2025
DataSheet
BAM017Z PDF
Availability
15 pieces
Unit Price
$523.55000

Current price of BAM017Z is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Bag
Part Status:Active
Type:Solid Tubing
Type Attributes:Smooth
Diameter - Inside:1.969" (50.00mm)
Diameter - Outside:2.094" (53.20mm)
Material:Silicone
Color:White
Length:24.61' (7.50m)
Wall Thickness:-
Operating Temperature:-60°C ~ 260°C
Heat Protection:-
Abrasion Protection:-
Liquid Protection:-
Environment Protection:-
Features:-
Material Flammability Rating:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT FIN1.75RD50

FIN1.75RD50

SLEEVING 1.75" ID FBRGLASS 50'
HOT PF2407/8 NA005

PF2407/8 NA005

SLEEVING 0.875" ID FBRGLASS 100'
HOT FPDSC-70B.25

FPDSC-70B.25

FIPLOCK, PA12 MOD BS, NW70, COAR
RS73G2ATTD3001C

RS73G2ATTD3001C

RES 3K OHM 0.25% 1/4W 0805

C0805C512M5JACAUTO

C0805C512M5JACAUTO

CAP CER 5100PF 50V U2J 0805

BAM017Z

BAM017Z

SHORT DESCRIPTION=SILICON TUBE,

7100-4565

7100-4565

BREADBOARD PREPUNCHED INSULATING

Top