30-01312

Image is for reference,
please contact us to get the real picture

Part No :

30-01312

Manufacturer
Tensility International Corporation
Description
CBL 8CON 18AWG 153M GRY
Catalog
Multiple Conductor Cables
Shipped from
HK warehouse
Expected Shipping Date
Aug 16 - Aug 20 2025
DataSheet
30-01312 PDF
Availability
0 pieces
Unit Price
$3.83240

Current price of 30-01312 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Spool
Part Status:Active
Cable Type:Multi-Conductor
Number of Conductors:8
Wire Gauge:18 AWG
Conductor Strand:41/0.0063"
Conductor Material:Copper, Tinned
Jacket (Insulation) Material:Poly-Vinyl Chloride (PVC)
Jacket (Insulation) Diameter:0.303" (7.70mm)
Shield Type:-
Length:502.0' (153.0m)
Jacket Color:Gray
Ratings:UL Style 2464
Features:-
Voltage:300 V
Operating Temperature:-25°C ~ 80°C
Usage:-
Jacket (Insulation) Thickness:0.0346" (0.880mm)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1422A 060500

1422A 060500

CABLE 10 COND 24AWG SHLD 500'
HOT 2041641

2041641

CABLE 41COND 16 AWG GRAY 1=1FT
HOT 25124 BK199

25124 BK199

MULT-PAIR 8COND 22AWG BLACK FEET
LF2B-C3P-BTHWW2-1M

LF2B-C3P-BTHWW2-1M

LED BAR IP65 330MM 12V 24VDC

SiT3372AI-1E9-33NZ148.425750T

SiT3372AI-1E9-33NZ148.425750T

XTAL OSC VCXO 148.42575MHZ

Z80-300

Z80-300

TOOL INSTALL FOR S-TEK RECEPT

30-01312

30-01312

CBL 8CON 18AWG 153M GRY

Top