3119A Y5P500

Image is for reference,
please contact us to get the real picture

Part No :

3119A Y5P500

Manufacturer
Belden
Description
CBL 3PR/24AWG 3COND/18AWG SHLD
Catalog
Multiple Conductor Cables
Shipped from
HK warehouse
Expected Shipping Date
Aug 17 - Aug 21 2025
DataSheet
3119A Y5P500 PDF
Availability
0 pieces
Unit Price
$1921.42000

Current price of 3119A Y5P500 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:DeviceBus®
Package:Spool
Part Status:Active
Cable Type:Multi-Pair
Number of Conductors:9 (3 Pair Twisted)
Wire Gauge:18 AWG, 24 AWG
Conductor Strand:7/26; 7/32
Conductor Material:Copper, Tinned
Jacket (Insulation) Material:Polyurethane (PU)
Jacket (Insulation) Diameter:0.333" (8.46mm)
Shield Type:Foil, Braid
Length:500.0' (152.4m)
Jacket Color:Green
Ratings:UL Style 20233
Features:Drain Wire, UV Resistant
Voltage:300 V
Operating Temperature:-40°C ~ 80°C
Usage:-
Jacket (Insulation) Thickness:0.0353" (0.897mm)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT M9700500 BK001

M9700500 BK001

AE TRAY CABLE 1000 FT
HOT 55PC6241-20-2/4/6-9CS2970

55PC6241-20-2/4/6-9CS2970

55PC CABLE
HOT M1115 SL001

M1115 SL001

CABLE 5COND 22AWG SHLD 1000'
RK73H2HTTE54R9D

RK73H2HTTE54R9D

RES 54.9 OHM 0.5% 3/4W 2010

RER65F39R2RCSL

RER65F39R2RCSL

RES CHAS MNT 39.2 OHM 1% 10W

DD62M20GEZ

DD62M20GEZ

CONN D-SUB HD PLUG 62P SLDR CUP

3119A Y5P500

3119A Y5P500

CBL 3PR/24AWG 3COND/18AWG SHLD

Top