2420/31 YL-1000

Image is for reference,
please contact us to get the real picture

Part No :

2420/31 YL-1000

Manufacturer
Daburn
Description
TEST LEAD 31AWG 150V YEL 1000'
Catalog
Single Conductor Cables (Hook-Up Wire)
Shipped from
HK warehouse
Expected Shipping Date
Aug 26 - Aug 30 2025
DataSheet
2420/31 YL-1000 PDF
Availability
0 pieces
Unit Price
$705.81000

Current price of 2420/31 YL-1000 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:2420
Package:Spool
Part Status:Active
Cable Type:Test Lead
Wire Gauge:31 AWG
Conductor Strand:75/50
Conductor Material:Copper, Bare
Jacket (Insulation) Material:Fluorinated Ethylene-Propylene (FEP)
Jacket (Insulation) Diameter:0.017" (0.43mm)
Jacket (Insulation) Thickness:0.0035" (0.089mm)
Length:1000.0' (304.8m)
Voltage:150V
Operating Temperature:-150°C ~ 150°C
Jacket Color:Yellow
Ratings:-
Features:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 67150 BR033

67150 BR033

METRIC ECOWIRE 67150 BROWN 100 M
HOT 28UL1007SLDGRA25

28UL1007SLDGRA25

HOOK-UP SOLID 28AWG 300V GRY 25'
HOT 9975 0021000

9975 0021000

HOOK-UP SOLID 24AWG RED 1000'
50YXH56MEFCTA6.3X11

50YXH56MEFCTA6.3X11

CAP ALUM 56UF 20% 50V RADIAL

0805J2000151KAT

0805J2000151KAT

CAP CER 150PF 200V C0G/NP0 0805

2420/31 YL-1000

2420/31 YL-1000

TEST LEAD 31AWG 150V YEL 1000'

TOS 06-12SM

TOS 06-12SM

DC DC CONVERTER 0.75-5V 30W

Top