2420/31 YL-100

Image is for reference,
please contact us to get the real picture

Part No :

2420/31 YL-100

Manufacturer
Daburn
Description
TEST LEAD 31AWG 150V YELLOW 100'
Catalog
Single Conductor Cables (Hook-Up Wire)
Shipped from
HK warehouse
Expected Shipping Date
Aug 07 - Aug 11 2025
DataSheet
2420/31 YL-100 PDF
Availability
0 pieces
Unit Price
$60.01200

Current price of 2420/31 YL-100 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:2420
Package:Spool
Part Status:Active
Cable Type:Test Lead
Wire Gauge:31 AWG
Conductor Strand:75/50
Conductor Material:Copper, Bare
Jacket (Insulation) Material:Fluorinated Ethylene-Propylene (FEP)
Jacket (Insulation) Diameter:0.017" (0.43mm)
Jacket (Insulation) Thickness:0.0035" (0.089mm)
Length:100.0' (30.5m)
Voltage:150V
Operating Temperature:-150°C ~ 150°C
Jacket Color:Yellow
Ratings:-
Features:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 22UL1007SLDBLU1000

22UL1007SLDBLU1000

HOOKUP SOLID 22AWG 300V BLU 1000
HOT CT2879-0-10

CT2879-0-10

TEST LEAD 20AWG 1000V BLK 32.81'
HOT 2475/20B OR-100

2475/20B OR-100

HOOK-UP STRND 20AWG ORANGE 100'
ERA-1ARC5111C

ERA-1ARC5111C

RES SMD 5.11K OHM 1/20W 0201

CRT0805-FX-4752ELF

CRT0805-FX-4752ELF

RES SMD 47.5K OHM 1% 1/8W 0805

2420/31 YL-100

2420/31 YL-100

TEST LEAD 31AWG 150V YELLOW 100'

D38999/24FD15HB

D38999/24FD15HB

CONN RCPT MALE 15POS GOLD CRIMP

Top