CKC21C104JWGAC7210

Image is for reference,
please contact us to get the real picture

Part No :

CKC21C104JWGAC7210

Manufacturer
KEMET
Description
KC-LINK 2220 0.1UF 650VDC C0G
Catalog
Ceramic Capacitors
Shipped from
HK warehouse
Expected Shipping Date
Jul 23 - Jul 27 2025
DataSheet
CKC21C104JWGAC7210 PDF
Availability
0 pieces
Unit Price
$1.88760

Current price of CKC21C104JWGAC7210 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Tape & Reel (TR)
Part Status:Active
Capacitance:-
Tolerance:-
Voltage - Rated:-
Temperature Coefficient:-
Operating Temperature:-
Features:-
Ratings:-
Applications:-
Failure Rate:-
Mounting Type:-
Package / Case:-
Size / Dimension:-
Height - Seated (Max):-
Thickness (Max):-
Lead Spacing:-
Lead Style:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 250R05L1R4AV4T

250R05L1R4AV4T

CAP CER 1.4PF 25V NP0 0201
HOT C0805C154KMREC7210

C0805C154KMREC7210

CAP CER 0805 150NF 63V X7R 10%
HOT C330C224K1R5TA7303

C330C224K1R5TA7303

CAP CER 0.22UF 100V X7R RADIAL
CKC21C104JWGAC7210

CKC21C104JWGAC7210

KC-LINK 2220 0.1UF 650VDC C0G

SFCG.24WH250

SFCG.24WH250

SLEEVING 0.022" ID FBRGLASS 250'

ADJ55048

ADJ55048

ADJ(DJ) RELAY (FLUX, 2C, SINGLE-

V24A5M300BS

V24A5M300BS

DC DC CONVERTER 5V 300W

Top