CKC21C393GCGAC7800

Image is for reference,
please contact us to get the real picture

Part No :

CKC21C393GCGAC7800

Manufacturer
KEMET
Description
KC-LINK 2220 39NF 500VDC C0G
Catalog
Ceramic Capacitors
Shipped from
HK warehouse
Expected Shipping Date
Jul 25 - Jul 29 2025
DataSheet
CKC21C393GCGAC7800 PDF
Availability
0 pieces
Unit Price
$1.95931

Current price of CKC21C393GCGAC7800 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Tape & Reel (TR)
Part Status:Active
Capacitance:-
Tolerance:-
Voltage - Rated:-
Temperature Coefficient:-
Operating Temperature:-
Features:-
Ratings:-
Applications:-
Failure Rate:-
Mounting Type:-
Package / Case:-
Size / Dimension:-
Height - Seated (Max):-
Thickness (Max):-
Lead Spacing:-
Lead Style:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1825Y0500105JXR

1825Y0500105JXR

CAP CER 1UF 50V X7R 1825
HOT 9009D0

9009D0

CAP CER 9PF 1KV SL RADIAL
HOT GJM0335C1H2R0BB01D

GJM0335C1H2R0BB01D

CAP CER 2PF 50V C0G/NP0 0201
CKC21C393GCGAC7800

CKC21C393GCGAC7800

KC-LINK 2220 39NF 500VDC C0G

000-68150

000-68150

CONN BNC JACK STR 50 OHM CRIMP

343.6-32-M8-40-KR

343.6-32-M8-40-KR

STAINLESS STEEL LEVELING FEET

0760105335

0760105335

CONN SHELL FOR IPASS SERIES

Top