TPCC-R-30A

Image is for reference,
please contact us to get the real picture

Part No :

TPCC-R-30A

Manufacturer
OptiFuse
Description
UL CLASS CC FUSE, TIME DELAY 30A
Catalog
Fuses
Shipped from
HK warehouse
Expected Shipping Date
Jul 28 - Aug 01 2025
DataSheet
TPCC-R-30A PDF
Availability
76 pieces
Unit Price
$19.63000

Current price of TPCC-R-30A is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:TPCC-R
Package:Bulk
Part Status:Active
Mounting Type:Holder
Fuse Type:Cartridge, Ceramic
Current Rating (Amps):30 A
Voltage Rating - AC:600 V
Voltage Rating - DC:300 V
Response Time:Slow Blow
Package / Case:5AG, 10mm x 38mm (Midget)
Breaking Capacity @ Rated Voltage:200kA AC, 100kA DC
Melting I²t:-
Approval Agency:CSA, UL
Operating Temperature:-
Color:-
Size / Dimension:0.409" Dia x 1.500" L (10.40mm x 38.10mm)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT GBB-V-1-R

GBB-V-1-R

FUSE CERM 1A 250VAC 125VDC 3AB
HOT 0498175.MXM6-CN

0498175.MXM6-CN

FUSE MIDI 32-VDC 175A W/ M6 HOLE
HOT SR-5-5A-AP

SR-5-5A-AP

FUSE BOARD MOUNT 5A 250VAC RAD
TPCC-R-30A

TPCC-R-30A

UL CLASS CC FUSE, TIME DELAY 30A

LT3085MPMS8E#TR

LT3085MPMS8E#TR

IC REG LIN POS ADJ 500MA 8MSOP

NX5032GA-24MHZ-EXS00A-CG07040

NX5032GA-24MHZ-EXS00A-CG07040

CRYSTAL 24.0000MHZ 18PF SMD

3201958

3201958

CONN FERRULE 8AWG RED

Top