UT020JC

Image is for reference,
please contact us to get the real picture

Part No :

UT020JC

Manufacturer
Souriau-Sunbank by Eaton
Description
CONN BACKSHELL W/CLAMP SZ20 PG21
Catalog
Circular Connectors - Backshells and Cable Clamps
Shipped from
HK warehouse
Expected Shipping Date
Jun 30 - Jul 04 2025
DataSheet
UT020JC PDF
Availability
0 pieces
Unit Price
$26.72000

Current price of UT020JC is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:Trim Trio®
Package:Bulk
Part Status:Active
Type:Backshell, Cable Clamp
Cable Opening:0.453" ~ 0.709" (11.50mm ~ 18.00mm)
Diameter - Outside:-
Shell Size - Insert:20
Thread Size:PG21
Cable Exit:180°
Material:Brass
Plating:-
Shielding:Unshielded
Color:Silver
Features:Sealing Gland, Strain Relief
Ingress Protection:IP68/IP69K - Dust Tight, Water Resistant, Waterproof
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT R85049/88-17N02

R85049/88-17N02

CONN BACKSHELL BANDING SZ 17 E
HOT IP-UNCA20W

IP-UNCA20W

UNIVERSAL 20 OLIVE DRAB CAD
HOT R85049/88-21N02

R85049/88-21N02

CONN BACKSHELL BANDING SZ 21 G
PSC-4024

PSC-4024

AC/DC CONVERTER 24V 41W

0640014600

0640014600

TOOL HAND CRIMPER 10-12AWG SIDE

UT020JC

UT020JC

CONN BACKSHELL W/CLAMP SZ20 PG21

811-22-017-30-001101

811-22-017-30-001101

CONN SPRING PISTON 17POS SMD

Top