1-1102111-2

Image is for reference,
please contact us to get the real picture

Part No :

1-1102111-2

Manufacturer
TE Connectivity AMP Connectors
Description
CONN HOOD CPLNG BOTTOM SZ1 PG11
Catalog
Heavy Duty Connectors - Housings, Hoods, Bases
Shipped from
HK warehouse
Expected Shipping Date
Jul 30 - Aug 03 2025
DataSheet
1-1102111-2 PDF
Availability
16 pieces
Unit Price
$18.92000

Current price of 1-1102111-2 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:HA.3, HTS
Package:Bulk
Part Status:Active
Connector Type:Hood - Coupling
Style:Bottom Entry
Size:1
Lock Location:Locking Clip (1) on Hood
Thread Size:PG11
Size / Dimension:0.945" L x 0.945" W x 1.811" H (24.00mm x 24.00mm x 46.00mm)
Housing Color:Gray
Features:Cable to Cable
Ingress Protection:-
Housing Material:Zinc, Die Cast
Housing Finish:Powder Coated
Operating Temperature:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 09300160301

09300160301

CONN BASE BOTTOM ENTRY SZ16B
HOT 1419249

1419249

CONN BASE BOTTOM SZD7
HOT 1772421

1772421

CONN HOOD SIDE ENTRY SZD25 PG16
1-1102111-2

1-1102111-2

CONN HOOD CPLNG BOTTOM SZ1 PG11

FJ9LCSC-07M

FJ9LCSC-07M

FIBER OPTIC CABLE SM LC-SC 7M

8150332503

8150332503

IND PRESS TO TEST GREEN

58312-B1

58312-B1

ROCKER ON-ON BLUE LED

Top