T1449320125-000

Image is for reference,
please contact us to get the real picture

Part No :

T1449320125-000

Manufacturer
TE Connectivity AMP Connectors
Description
H32A-SGR-M25
Catalog
Heavy Duty Connectors - Housings, Hoods, Bases
Shipped from
HK warehouse
Expected Shipping Date
Jul 30 - Aug 03 2025
DataSheet
T1449320125-000 PDF
Availability
32 pieces
Unit Price
$19.09000

Current price of T1449320125-000 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:HA
Package:Bulk
Part Status:Active
Connector Type:Base - Box Mount
Style:Side Entry
Size:H32A
Lock Location:Locking Clip (2) on Base Bottom
Thread Size:M25
Size / Dimension:4.173" L x 2.276" W x 3.311" H (106.00mm x 57.80mm x 84.10mm)
Housing Color:Gray
Features:-
Ingress Protection:IP65 - Dust Tight, Water Resistant
Housing Material:Aluminum Alloy, Die Cast
Housing Finish:Powder Coated
Operating Temperature:-40°C ~ 125°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1412636

1412636

CONN HOOD SIDE ENTRY SZB10 PG21
HOT 19430060755

19430060755

HAN-ECO 6B CABLE TO CABLE HOOD,
HOT T1349160120-000

T1349160120-000

H16A-TGH-M20
T1449320125-000

T1449320125-000

H32A-SGR-M25

CT0025-12-03

CT0025-12-03

CABLE TRAY L WALL BRACKET 12" ZI

TVN 3-1210

TVN 3-1210

DC DC CONVERTER 3.3V 2.3W

38Z2036

38Z2036

BTN CAP

Top