XW2R-P40MD-COM

Image is for reference,
please contact us to get the real picture

Part No :

XW2R-P40MD-COM

Manufacturer
Omron Automation & Safety Services
Description
COMTERM PUSH SPRNG 40POLE MIX
Catalog
Terminal Blocks - Power Distribution
Shipped from
HK warehouse
Expected Shipping Date
Jun 30 - Jul 04 2025
DataSheet
XW2R-P40MD-COM PDF
Availability
0 pieces
Unit Price
$68.47000

Current price of XW2R-P40MD-COM is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:XW2R-COM
Package:Bulk
Part Status:Active
Type:Power Distribution Block
Number of Poles:40
Line Side Connections Per Pole:1
Load Side Connections Per Pole:1
Line Side Connection Type:Push In
Load Side Connection Type:Push In
Line Side Wire/Stud Size:14-28 AWG
Load Side Wire/Stud Size:14-28 AWG
Voltage - Rated:-
Current Rating (Amps):10 A
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT GDB61601Z

GDB61601Z

PWR DISTRIB BLOCK 1POS 160A 600V
HOT PDB321-3

PDB321-3

POWER DISTRIBUTION BLOCK
HOT 16023-4

16023-4

PWR DISTRIB BLOCK 4POS 310A 600V
HOA1406-001

HOA1406-001

SNSR OPTO TRANS 3.05MM REFL L-MT

XW2R-P40MD-COM

XW2R-P40MD-COM

COMTERM PUSH SPRNG 40POLE MIX

CMDB4/4/R

CMDB4/4/R

DISTRIBUTION BLOCK RED 8 OUT 35A

AIMR5306

AIMR5306

LOOP POWERED

Top