55KEHD10BBSD

Image is for reference,
please contact us to get the real picture

Part No :

55KEHD10BBSD

Manufacturer
TE Connectivity Corcom Filters
Description
KEH 55A 2S SP DELTA BS 520 VAC
Catalog
Power Line Filter Modules
Shipped from
HK warehouse
Expected Shipping Date
Jul 09 - Jul 13 2025
DataSheet
55KEHD10BBSD PDF
Availability
6 pieces
Unit Price
$247.50000

Current price of 55KEHD10BBSD is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:KEH-BS
Package:Box
Part Status:Active
Filter Type:Three Phase (Delta)
Configuration:Two Stage
Voltage - Rated DC:-
Voltage - Rated AC:520V
Voltage - Rated AC (Phase to Ground/Neutral):-
Voltage - Rated AC (Phase to Phase):-
Current:55 A
Frequency - Operating:50/60Hz
Applications:General Purpose
Approval Agency:CSA, UL
Operating Temperature:-25°C ~ 85°C
Mounting Type:Chassis Mount
Termination Style:Terminal Block
Inductance:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 100KEMS10ABSD

100KEMS10ABSD

KEM 100A 1S HIGH PER SP BS DELTA
HOT 15KESS6AFPW

15KESS6AFPW

KES 15A 1S NUT WYE 440VAC 50HZ
HOT NAM-10-331-D

NAM-10-331-D

LINE FILTER 250VDC/VAC 10A DIN
4114R-2-151

4114R-2-151

RES ARRAY 13 RES 150 OHM 14DIP

BAP-1950A-C24A2-0-H-6OL

BAP-1950A-C24A2-0-H-6OL

SCR (THYRISTOR) 3-PHASE CONTROL

55KEHD10BBSD

55KEHD10BBSD

KEH 55A 2S SP DELTA BS 520 VAC

CL630WIP

CL630WIP

630MM WHITE IP67

Top