TO-11-060

Image is for reference,
please contact us to get the real picture

Part No :

TO-11-060

Manufacturer
Califia Lighting (Bivar)
Description
SPACER TUBULAR GEN PURP 0.062"
Catalog
Component Insulators, Mounts, Spacers
Shipped from
HK warehouse
Expected Shipping Date
Jul 03 - Jul 07 2025
DataSheet
TO-11-060 PDF
Availability
0 pieces
Unit Price
$0.04140

Current price of TO-11-060 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:DISS-O-PADs®
Package:Bulk
Part Status:Active
Type:Spacer
Shape:Tubular
Usage:General Purpose - Axial, Radial
Material:-
Color:Natural
Features:Wash Away
Length:0.062" (1.57mm) 1/16"
Width:-
Height:0.062" (1.57mm) 1/16"
Diameter - Outside:0.100" (2.54mm)
Diameter - Inside:0.045" (1.14mm)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 22CM0100

22CM0100

CAPACITOR MOUNT, .180 LONG, .045
HOT 119-096

119-096

MOUNT CIRCULAR TO18 0.096"
HOT 7717-30N

7717-30N

MOUNT CIRCULAR GEN PURP 0.075"
TO-11-060

TO-11-060

SPACER TUBULAR GEN PURP 0.062"

SFABL5000471MX1

SFABL5000471MX1

CAP FEEDTHRU 470PF 500V AXIAL

104TL2887-3

104TL2887-3

SWITCH TOGGLE 4PDT 100MA 115V

609 H-5-90

609 H-5-90

SLEDGE HAMMER ROTBAND-PLUS 3 KG

Top