MS70LT-MFFF-R

Image is for reference,
please contact us to get the real picture

Part No :

MS70LT-MFFF-R

Manufacturer
IndustrialeMart
Description
BEACON 70MM FLASH 110-220V RED
Catalog
Stackable Tower Lighting, Beacons, and Components
Shipped from
HK warehouse
Expected Shipping Date
Jul 01 - Jul 05 2025
DataSheet
MS70LT-MFFF-R PDF
Availability
6 pieces
Unit Price
$86.00000

Current price of MS70LT-MFFF-R is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:MS70LT
Package:Bulk
Part Status:Active
Type:Complete Unit
Number of Stacks:1
Lamp Type:LED
Light Color:Red
Function:Flashing, Emergency Flashing
Voltage - Supply:110 ~ 220VAC
Features:Direct Mounting
Termination Style:Wire Leads
Ingress Protection:IP65 - Dust Tight, Water Resistant
Operating Temperature:-20°C ~ 50°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT ASGS-20-B

ASGS-20-B

STROBE 86MM 220V STUD BLUE
HOT PTE-T-202-RG-B

PTE-T-202-RG-B

TOWER 56MM STEADY 24V RG
HOT 64587075

64587075

SIREN ELEMENT CONTIN/ALTERN. 24V
M2S025T-1FCS325

M2S025T-1FCS325

IC SOC CORTEX-M3 166MHZ 325BGA

MS70LT-MFFF-R

MS70LT-MFFF-R

BEACON 70MM FLASH 110-220V RED

MPZ-56C

MPZ-56C

BUZZER KIT FOR MT5C 56MM 240V

OBSAI-RP3-SC-UT3

OBSAI-RP3-SC-UT3

SITE LICENSE OBSAI RP3 SC/SCM

Top