TL70DXN9WBGYRQ

Image is for reference,
please contact us to get the real picture

Part No :

TL70DXN9WBGYRQ

Manufacturer
Banner Engineering
Description
TOWER LIGHT LED WH/BL/GR/YEL/RD
Catalog
Stackable Tower Lighting, Beacons, and Components
Shipped from
HK warehouse
Expected Shipping Date
Aug 25 - Aug 29 2025
DataSheet
TL70DXN9WBGYRQ PDF
Availability
5 pieces
Unit Price
$453.00000

Current price of TL70DXN9WBGYRQ is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:TL70
Package:Bulk
Part Status:Active
Type:Complete Unit
Number of Stacks:5
Lamp Type:LED
Light Color:Blue, Green, Red, White, Yellow
Function:Steady
Voltage - Supply:12 ~ 30VDC
Features:-
Termination Style:Wire Leads
Ingress Protection:IP65 - Dust Tight, Water Resistant
Operating Temperature:-40°C ~ 50°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT MS66M-B00-C

MS66M-B00-C

BEACON 66MM FLASH 12-24V CLR BZ
HOT JR16-R-4LCM1

JR16-R-4LCM1

STACKLIGHT RED STEADY LGT PULSE
HOT 85340055

85340055

LED PERM. BEACON BWM 24VDC CL
187A28

187A28

PWR XFMR LAMINATED 2.4VA CHAS MT

MBR2X160A150

MBR2X160A150

DIODE SCHOTTKY 150V 160A SOT227

TL70DXN9WBGYRQ

TL70DXN9WBGYRQ

TOWER LIGHT LED WH/BL/GR/YEL/RD

4917

4917

FERRITE ISOLATOR 18-26.50 GHZ

Top