MCP3913A1T-E/MV

Image is for reference,
please contact us to get the real picture

Part No :

MCP3913A1T-E/MV

Manufacturer
Roving Networks / Microchip Technology
Description
IC ENERGY METER FRONT 6CH 40UQFN
Catalog
PMIC - Energy Metering
Shipped from
HK warehouse
Expected Shipping Date
May 15 - May 19 2024
DataSheet
MCP3913A1T-E/MV PDF
Availability
1348 pieces
Unit Price
$3.38001

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of MCP3913A1T-E/MV is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)
Part Status:Active
Input Impedance:-
Measurement Error:0.1%
Voltage - I/O High:0.7V
Voltage - I/O Low:0.3V
Current - Supply:4.5mA
Voltage - Supply:2.7 V ~ 3.6 V
Meter Type:3 Phase
Operating Temperature:-40°C ~ 125°C
Mounting Type:Surface Mount
Package / Case:40-UFQFN Exposed Pad
Supplier Device Package:40-UQFN (5x5)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT ADE5566ASTZF62

ADE5566ASTZF62

IC ENERGY METERING 1PHASE 64LQFP
HOT LM25056APSQE/NOPB

LM25056APSQE/NOPB

POWER SUPPLY SUPPORT CIRCUIT, AD
HOT LTC2946CMS#TRPBF

LTC2946CMS#TRPBF

IC ENERGY MONITOR I2C 16MSOP
MCP3913A1T-E/MV

MCP3913A1T-E/MV

IC ENERGY METER FRONT 6CH 40UQFN

Top