90E46EMGI8

Image is for reference,
please contact us to get the real picture

Part No :

90E46EMGI8

Manufacturer
Renesas Electronics America
Description
IC ENERGY POLYPH METER 100-TQFP
Catalog
PMIC - Energy Metering
Shipped from
HK warehouse
Expected Shipping Date
Jul 14 - Jul 18 2025
DataSheet
90E46EMGI8 PDF
Availability
10300 pieces
Unit Price
$0.00000

Current price of 90E46EMGI8 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)
Part Status:Discontinued at Digi-Key
Input Impedance:-
Measurement Error:0.5%
Voltage - I/O High:-
Voltage - I/O Low:-
Current - Supply:-
Voltage - Supply:2.5 V ~ 3.6 V
Meter Type:Single Phase
Operating Temperature:-40°C ~ 85°C
Mounting Type:Surface Mount
Package / Case:-
Supplier Device Package:100-TQFP
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT AD71157ACPZ

AD71157ACPZ

IC ENERGY METERING 1PH
HOT STODPM01QTR

STODPM01QTR

IC ENERGY METER SGL PHASE 24QFN
HOT AD71129ACPZ

AD71129ACPZ

IC MEASUREMENT ENERGY CSP
CDRR105NP-680MC

CDRR105NP-680MC

FIXED IND 68UH 1.38A 195 MOHM

C1E-24.576-6-1015-X-R

C1E-24.576-6-1015-X-R

CRYSTAL 24.5760MHZ 6PF SMD

M7965-46

M7965-46

CONN SHUNT 2POS W/HANDLE 2.54MM

90E46EMGI8

90E46EMGI8

IC ENERGY POLYPH METER 100-TQFP

Top