DB16

Image is for reference,
please contact us to get the real picture

Part No :

DB16

Manufacturer
Altech Corporation
Description
PWR DISTRIB BLOCK 1 POS
Catalog
Power Distribution, Surge Protectors
Shipped from
HK warehouse
Expected Shipping Date
Aug 10 - Aug 14 2025
DataSheet
DB16 PDF
Availability
3255 pieces
Unit Price
$13.96000

Current price of DB16 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Bulk
Part Status:Active
Type:PDU (Power Distribution Unit)
Mounting Type:DIN Rail, Panel
Current - Max:80A
Region Utilized:International
Overload Protection:None
Connector - AC Input:Screw Terminals
Connector - AC Output:Screw Terminals
Voltage - Input:600V
Housing Material:Plastic
Media Lines Protected:-
AC Outlets:6
Energy:-
Cord Length:-
Approval Agency:CE, UR
Features:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT STV25K-24S

STV25K-24S

TVSS 240V 1PH 0-260V DIN MTG
HOT 1584T6D1

1584T6D1

POWER STRIP 13" 15A 6OUT 15'C
HOT 2907918

2907918

SURGE PROTECTION
AE320WB98SA

AE320WB98SA

CONN RCPT FMALE 6POS GOLD CRIMP

DB16

DB16

PWR DISTRIB BLOCK 1 POS

3AB 1

3AB 1

FUSE CERAMIC 1A 250VAC 3AB 3AG

C48-06R22-12S6-402

C48-06R22-12S6-402

CONN PLUG FMALE 12POS GOLD CRIMP

Top