PDU3VN10L1530

Image is for reference,
please contact us to get the real picture

Part No :

PDU3VN10L1530

Manufacturer
Tripp Lite
Description
PDU 3-PHASE MONITORED 208V 8.6KW
Catalog
Power Distribution, Surge Protectors
Shipped from
HK warehouse
Expected Shipping Date
Jul 28 - Aug 01 2025
DataSheet
PDU3VN10L1530 PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of PDU3VN10L1530 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Bulk
Part Status:Obsolete
Type:PDU (Power Distribution Unit)
Mounting Type:Rack, Vertical
Current - Max:24A
Region Utilized:-
Overload Protection:Circuit Breaker(s)
Connector - AC Input:NEMA L15-30P
Connector - AC Output:IEC 320-C13 (30), C19 (6)
Voltage - Input:208V
Housing Material:Steel
Media Lines Protected:-
AC Outlets:36
Energy:-
Cord Length:10' (3.05m)
Approval Agency:NOM, UL
Features:Load Meter
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT POWERSTRIP-10S

POWERSTRIP-10S

10 OUTLET POWERSTRIP W/SRG PROTE
HOT DB25

DB25

SURGE SUPPRESSOR RS-232 DB25M/F
HOT POWERSTRIP-10

POWERSTRIP-10

10 OUTLET POWERSTRIP
BXRC-27G1000-B-72

BXRC-27G1000-B-72

LED COB VERO 10 2700K STARBOARD

3120-F321-P7T1-W01D-2A

3120-F321-P7T1-W01D-2A

CIR BRKR THRM 2A 250VAC 50VDC

PDU3VN10L1530

PDU3VN10L1530

PDU 3-PHASE MONITORED 208V 8.6KW

PC817X2NIP0F

PC817X2NIP0F

OPTOISOLATOR 5KV TRANS 4SMD

Top