BC5500-G-DS-36

Image is for reference,
please contact us to get the real picture

Part No :

BC5500-G-DS-36

Manufacturer
Califia Lighting (Bivar)
Description
LED ENGINE C5500 GREEN 36" STRIP
Catalog
LED Lighting - COBs, Engines, Modules, Strips
Shipped from
HK warehouse
Expected Shipping Date
Jul 31 - Aug 04 2025
DataSheet
BC5500-G-DS-36 PDF
Availability
0 pieces
Unit Price
$168.54000

Current price of BC5500-G-DS-36 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:Coastline C5500
Package:Tube
Part Status:Active
Type:LED Engine
Color:Green
CCT (K):-
Wavelength:528nm
Configuration:Linear Light Strip, Plug and Play
Luminous Flux @ Current/Temperature:960lm
Current - Test:-
Temperature - Test:-
Voltage - Forward (Vf) (Typ):24V
Lumens/Watt @ Current - Test:-
Current - Max:-
CRI (Color Rendering Index):-
Viewing Angle:-
Features:With Connector
Size / Dimension:914.40mm L x 21.00mm W
Height:12.00mm
Light Emitting Surface (LES):-
Lens Type:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT SPHWW1HDN825YHV3ED

SPHWW1HDN825YHV3ED

LED COB LC006B 3000K SQUARE
HOT CXM-32-65-80-54-AC00-F2-3

CXM-32-65-80-54-AC00-F2-3

LED COB 6500K SQUARE
HOT I033-N7G0YEL40

I033-N7G0YEL40

LIGHT ENGINE YELLOW 725LM
G3RV-D03SL DC12

G3RV-D03SL DC12

SSR RELAY SPST-NO 3A 5-24V

BC5500-G-DS-36

BC5500-G-DS-36

LED ENGINE C5500 GREEN 36" STRIP

4-647008-0

4-647008-0

CONN PLUG 10POS IDC 22AWG GOLD

RJHSE7062A1

RJHSE7062A1

CONN MOD JACK 6P6C R/A UNSHLD

Top