BOP 2X72-3D

Image is for reference,
please contact us to get the real picture

Part No :

BOP 2X72-3D

Manufacturer
Kepco Power
Description
DUAL POWER SUPPLY RACK MNT 200W
Catalog
Equipment - Power Supplies (Test, Bench)
Shipped from
HK warehouse
Expected Shipping Date
Jul 24 - Jul 28 2025
DataSheet
BOP 2X72-3D PDF
Availability
10 pieces
Unit Price
$6660.00000

Current price of BOP 2X72-3D is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:BOP
Package:Box
Part Status:Active
Type:Rack Mount (AC to DC)
Voltage - Supply:95 ~ 250VAC
Voltage - Output:0 ~ 72VDC
Current - Output:0 ~ 3A
Display Type:LCD
Number of Characters:-
Number of Outputs:-
Size / Dimension:17.142" L x 12.531" W x 5.220" H (435.40mm x 318.30mm x 132.60mm)
Features:GPIB, RS-232
Power (Watts):200W
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT BOP 2X100-2DC

BOP 2X100-2DC

DUAL POWER SUPPLY RACK MNT 200W
HOT BOP 2X50-4DC

BOP 2X50-4DC

DUAL POWER SUPPLY RACK MNT 200W
HOT Z375-2.2-U

Z375-2.2-U

AC-DC PROGRAMMABLE 115-230VAC OU
4230-T130-K0DU-30A

4230-T130-K0DU-30A

CIR BRKR THERM 30A 480VAC/125VDC

LT1579CGN-5#TRPBF

LT1579CGN-5#TRPBF

IC BATT PWR MGMT MULTI 1C 16SSOP

Q2-F2XYG-1 1/2-08-QB48IN-5

Q2-F2XYG-1 1/2-08-QB48IN-5

HEATSHRINK 1 1/2"-48" YLLW/GREEN

BOP 2X72-3D

BOP 2X72-3D

DUAL POWER SUPPLY RACK MNT 200W

Top